The Boeing Company BA
At closeNov 11, 2026, 7:59 PM EST
After hours · Nov 11, 7:59 PM ET
- YTD
- -19.61%
- 1 year
- -10.59%
Discussion (5058)
Sign in to join the discussion
If push comes to shove, just attach a real door and be done with it.
The shows over pack your bags and git!
So all MaX pilot doors will pop open when there’s a significant drop in the air Compression! A security flaw or benefit unknown to pilots
With all these quality control issues it will set Boeing and Spirit back 2 months in the ramp up of MaX production!!
Wake up fire all those assemble workers that worked on the existing doors and inspectors. This is sabotage. ??
It use to be called idiot proof. But they didn’t want to offend the idiots. So now they call it fool proof. But they didn’t want to insult the fools. We are now at Error proof. The idiots and the fools have taken responsibility. A serious part of quality control.
Quality happens everywhere in a company. Quality in design (What is your engineering process that ensures you have the best design possible). Quality of prove-out or testing and validation (Do you have an appropriate test method that proves out the intended function? with statistical significance). Quality in manufacturing (this is actually the simplest one to get right).
Chic-Fila can’t just pump out sandwiches faster. The piece of chicken better be centered between the bun….?
In this industry, quality is a given. It’s is expected. DO YOUR JOB BOEING!
It’s like Chic-Fila, you can have the longest line that wraps around the building. But you will do much better if you can get those sandwiches out faster. The bottleneck is the production line. Orders mean nothing!
