Menu

Integra Resources Q3 2026 Earnings Call Transcript

Earnings Transcripts 2 hours ago

MarketsTrading IdeasNews

Integra Resources (AMEX:ITRG) reported third-quarter financial results on Thursday. The transcript from the company’s third-quarter earnings call has been provided below.This transcript is brought to you by Benzinga

Integra Resources (AMEX:ITRG) reported third-quarter financial results on Thursday. The transcript from the company’s third-quarter earnings call has been provided below.

This transcript is brought to you by Benzinga APIs. For real-time access to our entire catalog, please visit https://www.benzinga.com/apis/ for a consultation.

View the webcast at https://events.q4inc.com/attendee/634579062

Summary

Integra Resources reported strong production growth at Florida Canyon with 17,652 ounces of gold produced in Q3, marking an 8% increase quarter over quarter.

The company ended the quarter with a cash position of $119.5 million and working capital of $159.5 million, supporting its growth strategy at Florida Canyon and development projects like Delamar and Nevada North.

Integra revised its 2026 production guidance for Florida Canyon down to 59,000-62,000 ounces due to slower leaching rates, although higher-grade ore from the Central Pit is expected to improve production in 2027.

Exploration results at Florida Canyon are promising, with significant potential for resource growth in areas like the Central Pit–Radio Tower saddle and the Madre Shear North target.

The company is advancing the Delamar project with progress in engineering, permitting, and financing, aiming for a construction decision following the anticipated Record of Decision in the second half of 2027.

Operational challenges included elevated AISC of $3,059 per ounce due to increased mining rates and costs, but the company continues to invest in sustaining capital and exploration.

Management emphasized their strategic focus on becoming a multi-asset, U.S.-focused mid-tier gold producer, leveraging production from Florida Canyon.

Full Transcript

OPERATOR

2026 results conference call. All lines have been placed on mute to prevent any background noise. After the speaker’s remarks, there will be a question and answer session. If you would like to ask a question during this time, press star followed by the number one on your telephone keypad. If you would like to withdraw your question, press star one again. Thank you. I would like to turn the meeting over to Josh, Vice President of Investor Relations.

Josh, please go ahead.

Josh (Vice President of Investor Relations)

Thank you. I would like to welcome everyone to Integra Resources’ 2026 third quarter operating and financial results conference call. Before we begin, I would like to note that we will be making forward-looking statements during today’s call. I will direct you to the second slide of the earnings presentation, which contains important cautionary notes regarding the use of forward-looking statements. The cautionary notes can also be found on Integra Resources’ corporate website.

Please note all dollar amounts discussed today will refer to the US dollar unless otherwise indicated on the call. Today I’m joined by Integra Resources’ President, CEO and Director, George Salamis; Chief Operating Officer, Cliff Lafleur; Chief Financial Officer, Andre St. Germain; Vice President, Finance, Sean Deisner; and General Manager of the Florida Canyon Mine, Greg Robinson. Today we are pleased to provide an operating and financial update for the third quarter of 2026, followed by a live question and answer session. With that, I would like to hand the call over to George to kick things off.

George Salamis (President, Chief Executive Officer and Director)

Thanks, Josh. Good morning, everyone, and thank you for joining us today to discuss Integra Resources’ third quarter 2026 results. Thank you. The third quarter marked another period of strong progress for Integra Resources, with continued production growth at Florida Canyon supported by sustained high mining and stacking rates. This improving operational performance, combined with our strengthened financial position, is providing the foundation to execute on our broader strategy to become a multi-asset US-focused gold producer. When we acquired Florida Canyon in 2024, our objective was to establish a producing asset that could support Integra Resources’ next phase of growth.

Over the past two years, we have gained a much deeper understanding of the operation, made targeted investments and developed a mine plan that is expected to deliver higher production, lower cost and stronger cash flow in the years ahead. At the same time, we continue to advance our Delamar project in Idaho toward a future construction decision while unlocking additional value at our Nevada North project. Together, these projects provide a strong pipeline of growth opportunities that complement our producing asset at Florida Canyon. As we look ahead, our priorities are clear: continue improving operational performance at Florida Canyon, advance our development projects, and maintain a disciplined approach to capital allocation.

We believe the progress made this year has positioned Integra Resources for an important next phase of growth as we work towards becoming a mid-tier US precious metal producer. The company ended Q3 in a strong financial position with $119.5 million in cash and working capital of $159.5 million. This financial strength positions Integra Resources to execute on its growth strategy at Florida Canyon, advance Delamar towards an anticipated permit in the second half of 2027, and progress permitting and data collection at Nevada North to support advanced economic studies. Operationally, Florida Canyon has posted its second consecutive quarter of production growth, producing 17,652 ounces of gold in the quarter, an 8% increase quarter over quarter and a 40% increase over the first quarter of 2026.

The company mined 97,428 total tons per day, which is a record for the mine. With process grades decreasing throughout the year, Florida Canyon generated revenue of $72.4 million and operating cash flow of $21.8 million. The ore placed on the heap leach pad has increased 25% quarter over quarter as the company focuses on revised annual production guidance. With that, I will hand the call over to our COO, Cliff, to discuss the third quarter operating results for Florida Canyon.

Cliff Lafleur (Chief Operating Officer)

Thanks, George. Turning to slide six, we’ve outlined the key operating metrics for Florida Canyon in the third quarter of 2026. The third quarter showed strong operating results at Florida Canyon, with a record mining rate of 97,400 total tons mined per day. In Q3 2026, the company mined 5.3 million tons of ore and 3.6 million tons of waste at a strip ratio of 0.68 for the quarter. Average gold recovery was 52.5% for the quarter, which is down approximately 5%, reflecting the increased placement of run-of-mine ore on the heap leach pad versus crushed ore.

Florida Canyon produced 17,652 ounces of gold in the quarter and sold 16,760 ounces, totaling 46,666 ounces of gold produced year to date. Q3 2026 mine site AISC was $3,059 per ounce sold, below our revised guidance, and cash costs averaged $2,419 per ounce sold. Costs were impacted by elevated rates of mining, hauling and stacking, as well as higher diesel, labor and explosive costs. In the quarter we invested $10.6 million in sustaining capital focused on mobile equipment leases and refurbishments, as well as exploration drilling on resource growth. The company also continues to invest in a pre-stripping campaign at the Central Pit to access higher-grade ore, which will support the mine plan for the next few years.

Ore from this area will ramp up through Q1 and Q2 of 2027. The company expects investments in sustaining capital expenditures to remain elevated in Q4 of 2026. The company also invested $1.3 million in non-sustaining capital this quarter, primarily directed towards mobile fleet expansion and heap leach pad expansion to accommodate the longer mine life and increased production profile presented in the updated life-of-mine plan and technical report, which was filed in July of 2026.

Exploration at Florida Canyon continues to deliver exciting results. I’ll pass the call to George to discuss recent exploration results.

George Salamis (President, Chief Executive Officer and Director)

Thanks, Cliff. Turning to exploration, prior to our acquisition of Florida Canyon in 2024, investment in exploration had not been a major focus. As we gained a deeper understanding of the operation, we began identifying a number of opportunities to grow the resource base both within or immediately adjacent to existing mining areas and areas outside the mine gate. In addition, we also developed a new geological model for Florida Canyon focused on improving our understanding of the geological controls on gold mineralization across the property.

This work has helped us to refine our exploration strategy, identify new targets and prioritize opportunities that could add meaningful ounces to the mine plan. Our recent drilling results are beginning to demonstrate the potential of this approach. One of the most promising areas is the Central Pit–Radio Tower saddle target, a 3.9 kilometer by 2.9 kilometer area located between two existing open pits. Recent drilling has delivered some of the strongest results since we’ve acquired Florida Canyon, including 1.3 grams per tonne gold over 62.5 meters and 0.59 grams per tonne gold over 167.6 meters. These results highlight the potential for meaningful resource growth within the existing mine footprint.

As you can see in this cross section, the Central Pit–Radio Tower pit saddle area mineralization is near surface with strong gold grade continuity throughout the drill hole. The grades encountered in the drilling are consistent with or exceeding those currently being mined at Florida Canyon. Furthermore, given its location between existing pits and close to established infrastructure, this area has the potential to support future mine plans and contribute additional gold ounces to the production profile.

The company has planned an additional 54 drill holes representing 5,400 meters at this target. Exploration drilling has also identified the Madre Shear North target, a new near-mine exploration opportunity located beneath the North Delm, whose material was included in the updated mine plan. The southern portion of the Madre Shear was mined by previous operators, but its northern extension remained largely unexplored due to limited access. Exploration drilling will also continue this year at the Standard Mine, a past-producing mine situated 8 km south of Florida Canyon and the first target to be tested outside of the existing mine footprint by Integra Resources.

Now I will hand the call back to Cliff to discuss Delamar updates.

Cliff Lafleur (Chief Operating Officer)

Thank you, George. I’m now on slide 9. Delamar continues to advance on multiple fronts as we prepare the project for a construction decision. Our focus has shifted from defining the project to preparing it for execution, with detailed engineering, procurement, permitting, infrastructure projects and project financing activities all progressing in parallel. This work is designed to reduce execution risk and position Delamar for a final investment decision following receipt of the Environmental Impact Statement and Record of Decision, which are expected in the second half of 2027.

The public comment period of the National Environmental Policy Act ended in June 2026, and the Bureau of Land Management and its consultants have developed the issues statement that will drive analysis in the Environmental Impact Statement. In addition, by the end of this year, Integra Resources will have collected five years of baseline work at Delamar, including thousands of surface and groundwater quality samples, air quality samples, and meteorological data.

On engineering, Ausenco and SLR continue to make progress on critical infrastructure including heap leach pad design, solution management systems, water treatment facilities and electrical power infrastructure. In parallel, we are advancing procurement of long-lead equipment including the Merrill-Crowe processing plant, crushing facility and electrical equipment, with principal orders expected to be placed by year’s end. We have also made significant progress on site preparation and infrastructure improvements.

In July, we mobilized a crushing plant to Delamar, which has processed approximately 39,000 tons of historical backfill material from privately owned land on both Delamar and Florida Mountain to further validate the crushing circuit outlined in the feasibility study. In addition, we completed upgrades to the project’s access bridge and continue to advance refurbishments of the existing truck shop, which will support future mining operations. Another important milestone was the appointment of Gen Cap Mining Advisory as our project financing advisor. Gen Cap is helping us evaluate a range of potential financing alternatives and develop a financing strategy ahead of a construction decision. This is an important step in ensuring that our financing preparations advance alongside engineering, permitting and procurement. Overall, we’re pleased with the progress at Delamar. With permitting progressing and engineering, procurement and financing advancing in parallel, Delamar is well positioned to become Integra Resources’ next producing gold asset.

I’ll now pass the call to our CFO, Andre, to provide an overview of the third quarter financial results.

Andre St. Germain (Chief Financial Officer)

Thanks, Chris. Integra closed the third quarter of 2026 with its strongest financial position to date, with a cash balance of 119.5 million and working capital of 159.5 million. With the exception of our mobile equipment financing, the company has been debt free since December 2025. The company reported Q3 2026 revenues of 72.4 million with a cost of sales of 49.1 million, resulting in 23.3 million in mine operating earnings. This represents a 32% operating profit margin for the quarter. In Q3 2026, Florida Canyon sold 16,760 gold ounces at an average realized price of 4,272 per ounce, compared to 20,265 gold ounces sold at an average realized price of 3,464 in Q3 2025.

Operating cash flows of 21.8 million, or $0.11 per share, in Q3 2026 decreased from 35.6 million in Q3 2025 largely due to a 15.3 million increase in cash used for working capital, primarily driven by a buildup of inventories. Q3 2026 adjusted earnings were 12.8 million, or $0.06 per share, compared to 16.3 million, or $0.10 per share, in Q3 2025. The decrease was primarily driven by a higher cost of sales. Free cash flow was 11.1 million, or $0.05 per share for the quarter, compared to 20.2 million, or $0.12 per share in Q3 2025, mainly due to lower operating cash flow.

I will now pass the call back to Cliff to discuss revised guidance.

Cliff Lafleur (Chief Operating Officer)

Thank you, Andre. Turning to guidance, we are revising 2026 production guidance in Florida Canyon from 70,000 to 75,000 ounces of gold down to 59,000 to 62,000 ounces of gold produced. Recent leaching rates have not kept pace with the higher mining rates we’ve been running this year. As we strip the higher-grade ore body in the central pit to maintain effective blending and protect the long-term performance of our heap leach pad, we’re reducing mining rates for the rest of the year.

Looking ahead, once we complete the stripping campaign at the central pit, we’ll have access to higher grade ore and expect to support more consistent production. Passing the call back to George for next steps.

George Salamis (President, Chief Executive Officer and Director)

Thanks, Cliff. Turning to slide 12, looking ahead, we have several important milestones across our portfolio as we close out 2026 and move into 2027. At Florida Canyon, we are accelerating construction of the heap leach pad expansion to support the updated mine plan while continuing our extensive exploration program. These investments are expected to support increased gold production and lower operating costs beginning in 2027. At Delamar in Idaho, our focus remains on advancing engineering, procurement, infrastructure improvement, and project financing preparations. We are currently working towards placing orders for long-lead equipment by year-end while progressing through the federal permitting process, with the Record of Decision anticipated in the second half of 2027. At Nevada North, exploration drilling is underway as we work toward an updated technical report and advanced economic studies in 2027.

Overall, we believe Integra is well positioned for its next phase of growth, with Florida Canyon generating production and cash flow to support the advancement of our development portfolio and our long-term objective of becoming a multi-asset, U.S.-focused mid-tier precious metals producer. Closing, I want to reinforce why we believe Integra represents a compelling investment opportunity, combining current gold production with a strong pipeline of advanced-stage development projects, all located in the United States. At Florida Canyon, we have established a solid production base, with higher gold production and lower operating costs expected to begin in 2027 and improve over the extended mine life. At Delamar, we continue to advance permitting towards the anticipated receipt of the Record of Decision in the second half of 2027.

And at Nevada North, we are laying the groundwork for the next phase of advanced economic studies, exploration, and permitting. Across these three assets, we control a peer-leading gold resource inventory and a strong pipeline of heap leach assets in the Great Basin. Combined with our strong financial position and experienced leadership team, we believe we have the assets, people, and financial flexibility to execute on our strategy. Ultimately, our objective is clear: leverage the production and cash flow from Florida Canyon to advance our development portfolio and build Integra into a multi-asset, U.S.-focused mid-tier gold producer.

With several important catalysts ahead of us, we believe we are entering an exciting phase of growth. To all of you, thank you for joining us today. With that, I’d like to turn the call back to the operator to begin the question and answer session.

OPERATOR

We will now begin the question and answer session. If you would like to ask a question, please press star-one to raise your hand. To withdraw your question, press star-one again. We ask that you pick up your handset when asking a question to allow for optimum sound quality. If you are muted locally, please remember to unmute your device. Please stand by while we compile the Q&A roster. Your first question comes from the line of Joseph Rieger with Roth Capital Partners. Your line is open. Please go ahead.

Joseph Rieger (Analyst at Roth Capital Partners)

Hey, George and team. Thanks for taking the questions. I guess first thing on the revised guide, can you give us a little more detail on the rationale behind why it’s necessary to reduce the stacking rate? And then do you think this will roll into the potential for production for ’27, both on the production side and cost side?

George Salamis (President, Chief Executive Officer and Director)

Sure, Joe. Thanks. Before I pass that question on to Cliff: yes, the guidance revision is largely due to the decreased leach rates that we’re experiencing right now. And moving forward, I’m going to let Cliff opine on those.

Cliff Lafleur (Chief Operating Officer)

Thanks, George. Good question. To provide a little bit of context to maybe add a bit to the production guidance adjustment: we were mining in a few areas and, as you note, through Q1, Q2, Q3 our mining rates were coming up. The grades were lower in 2026 while we’re stripping C4 to access better grades in the next few years. So we were able to validate that the mining fleet can do that, which we were pretty excited about. However, these areas were not as consistent as, say, a central pit in fines production, and balancing the blending of fines with the higher production rates as we ramped up became too difficult to maintain the leaching rates. So we backed off the mining, which is the reason for the guidance adjustment. In 2027, we see more C4 coming in in Q1, Q2, which will further stabilize the blending rates. That’s already baked into the technical report, so we’re not seeing at this time any major impacts to production.

We still need to do some work on the guidance for next year, but that’s being done right now to make sure that we can get to those ranges. As for costs, we’re also not yet prepared to release costs, but based on the spending this year and what was expected next year, we’re not seeing any big surprises there other than what’s going on in the world around us.

Joseph Rieger (Analyst at Roth Capital Partners)

Okay. And then as you mentioned—

George Salamis (President, Chief Executive Officer and Director)

I’m going to just further jump in there, Joe, with one further thing to start off with, heading back to the leach rates. I’d really like to add that those ounces are on the pad, right? And I hope that’s clear to everybody. They are on the pad. They’re just leaching slower than we expected, and they will get recovered over the course of time.

Joseph Rieger (Analyst at Roth Capital Partners)

Okay. And then, as you think about the step-up on pad in Q2 and Q3 and then realizing you need to back off in Q4, what do you think an optimal quarterly stack rate is? Are you guys still working on that?

George Salamis (President, Chief Executive Officer and Director)

I think that’s a detailed question I’m going to pass back to Cliff.

Cliff Lafleur (Chief Operating Officer)

Yeah, it’s a question that has a few variables in it, including what your grade is. And I think one of the other learnings from mining at a higher rate is the volume capacity you have on the pad. One of the other variables we’ve been dealing with—and we’re working to fix this, which is why we’ve advanced pad expansion into 2026—is we learned pretty quickly that pads at Florida Canyon have historically, in the market a few years ago, been built very small.

So you don’t have a lot of room to maneuver and not a lot of flexibility when you’re trying to do things like blend. We’re fixing that over the next year, call it year and a half, by advancing some leach pad space. So to answer your question more directly, I can’t give you a stacking rate. If we’re producing 17,000 ounces a quarter, that typically works out to 70. So up to 20,000 ounces gives you, I think, over 80. We’re trying to balance that kind of gold production with how much you can stack, depending on grade and fines you’re finding in some of the areas you’re mining.

Joseph Rieger (Analyst at Roth Capital Partners)

Okay. All right, fair enough. I’ll turn it over. Thanks for taking the questions.

George Salamis (President, Chief Executive Officer and Director)

Thanks, Joe.

OPERATOR

Your next question comes from the line of Simon Wildsmith with Desjardins Securities. Your line is open. Please go ahead.

Simon Wildsmith (Analyst at Desjardins Securities)

Thanks, operator. Morning, team. Thanks for taking my questions. Just two for me. Maybe just to quickly follow up again on the reduced mining rates: is this related at all to—like, I know that you guys have been talking a little bit about run-of-mine stacking and the trade-off between recoveries. Is it partly driven by that? And then also, are you guys guiding to a Q4 stacking rate, and is it driven by kind of crusher capacity? Anything you can give there would be helpful.

George Salamis (President, Chief Executive Officer and Director)

Thanks, Simon. I’m going to pass that to Cliff. Two questions in there, Cliff, for you to answer.

Cliff Lafleur (Chief Operating Officer)

Yeah, just to clarify, the first question was on: does the reduced rates have to do with the increase in ROM? And the second question is: would extra crushing capacity help? Did I get that right?

Simon Wildsmith (Analyst at Desjardins Securities)

Yeah, right on the first one. The second one, yeah, maybe more on, like, is there any sort of measure we can expect for a mining or stacking rate for the last quarter?

Cliff Lafleur (Chief Operating Officer)

So the first question: we had the increase in ROM and the recovery baked into the plan when we set off with more mining. It has to do with the unpredictability of the fines that we were finding. So planning for the blending rates in reality turned out to be more difficult to actually execute on when you’re dealing with a smallish pad, compared to, say, a Bald Mountain where they have lots of room to do blending on. The second question: I don’t have off the top of my head the stacking rate we’re going to, but I’d say it’s more like what we were doing in Q1, Q2. Okay, the question on crushing: we do have in our permit a 14 million ton crush limit on our crushing, and we only have capacity on site for eight. So you’ll note in our technical report one of the large opportunities we’ve highlighted—and we’re working on—we’ve done some scoping work in 2026, and now we’re advancing that work to more detailed engineering in 2027, is we should be doing more crushing.

That’s a no-brainer. We’re looking at what that actual cost would be and what the actual crushing system and logistics would be. We want to validate those capital costs before we would actually make any purchases. But that’s what we’re doing with that opportunity from the technical report.

Simon Wildsmith (Analyst at Desjardins Securities)

Okay, thanks. And then one last question from me: maybe does the reduced mine rates—I’m just wondering—is that going to impact at all access to the central pit area or the higher grades that you’re anticipating next year? Is the timeline on that still unchanged?

Tim

That’s a good question. Yeah, we’ve been able to maintain our stripping rates through all of this. It’s one of the things you’ll note if you go back into press releases past the ownership of Integra Resources, you’ll note the ebbs and flows of where they can be stripping and where they can be mining ore. With the addition of the new equipment that we’ve made in 2026 we can maintain the stripping required to get into C4 while also mining ore. So it’s been a huge plus for us to stay on track.

So you’re seeing, you know, some of the rates that were in Q1 and Q2; you’re starting to see that that’s where we need to be. Once the stripping is complete, we can kind of back off again.

Ami

Okay. Okay. Thanks, Tim. Yeah, that’s it for me. Thanks again.

OPERATOR

Thanks, Ami. We have reached the end of the Q&A session. I will now turn the call back to George Salamis, president and CEO, for closing remarks.

George Salamis (President, Chief Executive Officer and Director)

Thanks very much. No further closing remarks. Look forward to reporting on the next quarter exploration results and everything else to come. Thanks very much. Operator.

OPERATOR

This concludes today’s call. Thank you for attending. You may now disconnect.

Disclaimer: This transcript is provided for informational purposes only. While we strive for accuracy, there may be errors or omissions in this automated transcription. For official company statements and financial information, please refer to the company’s SEC filings and official press releases. Corporate participants’ and analysts’ statements reflect their views as of the date of this call and are subject to change without notice.

Read the original