Soluna Holdings Reports March BTC Mined Of 9.7

Benzinga Newsdesk 6 months ago

News

Projects Annie, Gladys, and Fei are now being advanced outside of the ERCOT Large Flexible Load Batch study process, leveraging the sub-75 MW interconnection pathway to accelerate development timelines.

  • Projects Annie, Gladys, and Fei are now being advanced outside of the ERCOT Large Flexible Load Batch study process, leveraging the sub-75 MW interconnection pathway to accelerate development timelines.

Read the original